The geothermal tubing was laid and concrete poured in all 8 containers. Now we are just waiting for the ceiling to be complete so we can have the atrium poured.
June 2015
The ceiling is done ! We used metal roofing that would be used as exterior roofing as our ceiling. Saved on hauling 12 ft sheets of drywall up 16 ft and then having to tape and mud overhead also 16 ft up. Turned out good.
Now we can get the geothermal tubing run in the atrium and have the cement poured end of this week.